Highland Park Cemetery Mausoleum Improvements
This LEED-CI Silver project touched every surface in the building, all while maintaining the sanctity of the crypt while work was completed. A few of the many aspects of this project:
Complete update of all incoming services, including a new 1,800' water service and new electrical service.
Full waterproofing of the entire foundation and basement walls
Complete masonry restoration of the entire building exterior, including full tuck pointing, rebuilding of significant portions of the granite facade, tear-down and rebuild of the failing retaining wall, waterproofing and significant areas of lintel replacement.
Complete new interior insulation and air seal of the office and common areas of the building.
All exterior walls were furred, insulated and drywalled and all interior walls were rebuilt with new gypsum plaster, replicating the original wall finish.
Completely new high-efficiency aluminum windows with lead caming to replicate the original leaded glass.
Completely new high efficiency mechanical, electrical and plumbing systems.
Complete restoration of the interior of the chapel including the existing oak trusses and ceiling, slate floor, oak altar rails and lectern and the hand-carved decorative surround on the casket lift.
Restoration and re-use of all salvageable doors and trim throughout the building.
Replacement of all of the deteriorated marble as well as complete polishing of the marble floors.
Restoration of the historical bronze doors.